Approvals in Dubai Team is specialized in providing all types of approvals from Dubai Silicon Oasis Authority. We Provide DSO approval services as well as approvals from other authorities in Dubai like Dubai Municipality, DDA, DCD, JAFZA, EMAAR, TRAKHEES, NAKHEEL, etc.
A worldwide recognized free zone, Dubai Silicon Oasis is an integrated technology park that allows people to live, work, and play all together in one place. Located in an urban masterplanned community with a state-of-the-art infrastructure and offering state-of-the-art business services, DSO is a modern, technology-based community with an urban master-planned community and an iconic location. It has been established by the Dubai government in the year 2004 and it has been known as Dubai Silicon Oasis or DSO for short. It is one of the most important free trade zones in the world. As a result of the establishment of the free trade zone, Dubai can now be considered to be a hub for high tech industries as the world’s leading business city. As a result of the many incentives and facilities provided by the DSO Authority, there have been many high tech industries able to relocate to the tech park from around the world.Dubai’s government has invested millions of dollars to develop the best facilities in the free zone spread across an area of 7.2 square kilometers, making it one of the most attractive areas to set up a business in the world. Our Team can assist you in getting DSO approval from Dubai Silicon Oasis or Dubai Silicon Oasis Authority. To get the best and most efficient DSO approval services, contact us right now
SILICON OASIS (DSA) APPROVAL DUBAI
The benefits of becoming a district of DSO are numerous. There is a Brobdingnagian likelihood of growth and recognition for a high technical business in DSO Approval. There are a number of reasons why you should line up a business in the DSO area unit.
BENEFITS OF DUBAI SILICON OASIS (DSA) APPROVAL
• DSO Approval contains all sorts of recent facilities that a high technical business needs. • The premises conjointly contain the fire, water, and irrigation system with hygienically water network. • The technical park is a entranceway to achieve dead set billions of individuals. • The technical park imposes no tax nor will it impose any company tax. • The technical park provides E-business system with fast and economical services. • The rules and rules at intervals the technical park area unit clear and stable. • The technical park has a simple licensing method and low value of operations. • The visa process for the staff is additionally fast.
What we are doing for clients??
• In order to obtain a fit out permit from the DSOA, we take the proper care and attention to obtain it for you • It is our responsibility to prepare all the necessary drawings and to collect all the necessary documents that the client has provided • It is also our responsibility to provide our client with support until the Fit Out work has been completed and the Completion Certificate has been issued.
Documents required DSO Approval
1. Letter of intent 2. Copy of passport of the manager 3. Freehold/ demesne acknowledgment kind. 4. Filled up the application 5. Copy of Doctor of Education, Unit deed and workplace occupancy contract 6. Civil defense approved drawings original if needed 7. Consultant Contractor appointment letter signed by the Tenant 8. Existing projected Layouts 9. Original automotive policy and third-party insurance 10. Original Notification Letter from the building owner homeowners Association to 11. DSOA 12. Tenants Name and Complete Address 13. Unit lease contract
From tenant side
1. Copy of Trade license 2. Copy of RERA (EJARI) ) 3. NOC from the landlord/building owner/developer/property management 4. Contractor appointment letter (original) 5. copy of abidance contract and deed of conveyance (if chartered by deed of conveyance holder) 6. NOC from the deed of conveyance holder (if applicable) 7. AS-BUILT drawings in CD 8. DCD approval 9. DSO drawings review charges (15oo DHS mini/ or 66 fils/ feet² as per tenancy) 10. CAR policy (Contractor all risk policy)
From contractor side
1. Filled Application 2. Job acceptance letter 3. Softcopy in CD 4. Trade license copy 5. outline the program of labor/scope of work 6. All drawings (thoroughly reviewed and self-signed) within the following the order
Civil DSO Approval
1. Keyplan 2. Existing architectural plan 3. Proposed architectural plan 4. Proposed Flooring material layout 5. Proposed Ceiling layout 6. Proposed mirrored Ceiling layout 7. The proposed article of furniture layout 8. Section
Mechanical DSO Approval
1. Existing HVAC layout 2. Proposed HVAC layout 3. Existing fireplace mechanical device 4. Proposed mechanical device 5. Existing water system and drainage (for the restaurant only) 6. The proposed water system and drainage (for the restaurant only)
Electrical DSO Approval
1. Existing and planned load schedule 2. Existing lighting layout 3. Proposed lighting layout (including circuit variety with dB name) 4. Existing power layout 5. Proposed Power layout 6. Existing smoke detector layout 7. Proposed smoke detector layout 8. Existing Emergency + Exit layout 9. Proposed Emergency + Exit layout 10. Power layout coordinated with the article of furniture
Disclaimer We are not a government entity, but we are an approved contractor. The views expressed on this website are our own and do not necessarily reflect the views of the government.